This is a list of just some of the major earthworks contracts that Geddes have been involved in:
| Landscaping | General EarthWorks | Specialised Operations |
| Westfield
OCCS Dundee DC - Tip Rehabilitation Pumpherston Bing Arbroath SDA - Rehabilitation Fenton Barns South Esk Estates Angus Council - Montrose |
Westfield
OCCS Miller Mining Restoration Marshall Poultry Ross Poultry A90 Brechin By-Pass Gilmerton Bing A720 Edinburgh By-Pass A68 St Boswells A1 Cockburnspath Devilla Quarry, Alloa Aberdeen WWTP Wallyford Rail Diversion Seafield Development, Kirkcaldy St Andrews Beach |
Clay
Lined Cells at: Youngs Paraffin & Light Oil Gilchorn Farm, Arbroath Specialised Lining of Cells at: Tar Ponds for Young's Paraffin Wellbank Tip Ethiebeaton Farm, Arbroath East Denside, Dundee Contaminated Land Remediation at: Cleary Moor RAF Edzell Water Storage Ponds at: Numerous Locations primarily for farming operations. |
The Geddes Group have built up a large customer base over the years and this has grown largely due to the Group's willingness to facilitate the customer requirements. These requirements may vary from a rapid response to plant hire, out of ours working, provision of unusual items of equipment (custom made if necessary) and also supply of materials to specification and to suit the customers needs.
The picture shown represents a specific, but not entirely unusual, supply requirement. The construction of the British Gas pipeline from St Fergus to Bishop Auckland, in County Durham, involved the dredging of a trench across the Tay estuary. Once the trench was excavated, the pipelinr laid and trench backfilled there was a requirment to provide stone protection to the pipeline
The stone protection was positioned using precision dumping methods from a bottom-dump barge (as shown). Dumping took place continually on a 24 hour cycle over a period of 2 months and during that time the Geddes Group supplied the required 164,000 tonnes of 150mm to 200mm stone. The stone was supplied from the Group quarries, hauled by Group transport and then stockpiled and re-loaded using group plant working hours to match the customer requirements